Havering 6th Form College

Client: Energy Practice Ltd and F&W Electrical Ltd.

Completed the removal and reinstatement of the main electrical LV panel to the site.

The works were completed in the summer holidays of 2012; the works involved the removal of the existing main LV panel whilst keeping the essential security and fire equipment running.  This was carried out by means of temporary feeding the services from the existing as it was being dismantled and the use of generators.  We were able to carry out the renewal of the main LV panel with only loss of power to the essential supplies for a couple of hours.  In addition to the main project we have been instructed to replace 5 miniform panels throughout the college campus over the forth coming term break.

Call now 01375 408361
Book electrical inspection